Large DOS calculations
Posted: Wed Aug 23, 2006 12:22 pm
I'm currently calculating the DOS for several large metal/adsorbate systems. The largest of these, however, is simply too big a calculation to undertake at once. I've been experimenting with trying to split the run up and treating the k-points individually (or as small groups), as described in the manual. I've done this by using the IBZKPT file from a previous run.
However, the manual recommends that one use the Tetrahedron Method (ISMEAR = -5) for DOS calculations. To enter the k-points explicitly using this method you need the tetrahedra connection list. I cannot find how to calculate this when I am extracting just some of the k-points from the previous run.
How, therefore, can I perform this calculation? Is it okay not to use the tetrahedron method in this case, or is there another way of generating the connection list. Or can I only treat one k-point at a time? (annoying, as there is a considerably number of k-points in this system).
Many Thanks
However, the manual recommends that one use the Tetrahedron Method (ISMEAR = -5) for DOS calculations. To enter the k-points explicitly using this method you need the tetrahedra connection list. I cannot find how to calculate this when I am extracting just some of the k-points from the previous run.
How, therefore, can I perform this calculation? Is it okay not to use the tetrahedron method in this case, or is there another way of generating the connection list. Or can I only treat one k-point at a time? (annoying, as there is a considerably number of k-points in this system).
Many Thanks